top of page
MASTERPLAN_.jpg
20200724_BATANG - Exterior View 01.jpg
20200724_BATANG - Exterior View 01.jpg
V4_Semi Aerial View.jpg

LIST OF TENANTS

clients_0011_kcc.png
clients_0010_rki.png
clients_0009_yih-quan.png
clients_0008_tawada.png
clients_0005_unipack.png
clients_0007_cosmos.png
clients_0006_jayamas.png
clients_0004_wavin.png
clients_0002_aneka.png
clients_0000_window.png
clients_0003_interskala.png
450 (1).jpg

BASIC INFRASTRUCTURE

Multi-level Toll Access KM 371 +800

1

Expansion of Train Station
& Dry Port

3

Secondary Road 11,4 km

2

Jetty

5

Main Road 5,2 km

4

03_Suasana Koridor Kawasan OPT-2.JPG

UTILITIES

Electricity.png

ELECTRICITY

Main Power Station (until 2022)

2x60 MVA

Power Quality
Frequency 49.5 - 50.5 Hz
Voltage 20 Kv  + 5% - 10%
cos ‘0.85 lagging

EleCTRICITY

Main Power Station 2x60 MVA Capacity (Until 2022
 

Power Quality
  • Frequency 49,5 - 50,5 Hz
  • Voltage 20 KV +5% - 10%
  • Cos 0,85 Logging

GAS

Gas.png
Supply up to 15 MMSCFD (until 2024)
 
  • Pressure
  • GHV 
  • Gravity 
  • Temp    
  • Water   
  • Nitrogen
  • Carbon  

ICT

ICT.png
  • Internet      : 20 - 100Mbps
  • Type           : Fiber Optic
  • Telephone  : Upto 1000 Lines

​    Services
  • Telephone
  • Internet
  • IPTV
  • CCTV

 

: 350 - 500 PSiG
: 950 - 1000 BTU/SCF
: 0,5 - 0,8
: 60 F – 120 F
: Max 10 lb/MMSCF
: Max 3% mol
: Max 8% mol
Water.png

WaSTEWATER & WATER TREATMENT

  • Supply       : 1045L/S
  • Transport  : 3200m/day
 
 
    Clean Water
  • Supply    : 1.357L/s
  • Chloride : 250mg/L
  • Calcium : 500mg/L
sarra-marzguioui-ds7Usy7Qvko-unsplash.jpg

INVESTMENT RANGE CALCULATOR

arrow&v
arrow&v
arrow&v
bottom of page